Stages of construction

01.06.2013

01.04.2013

01.02.2013

01.12.2012

We are preparing the commissioning of the 3rd building. Thus, the work for launching the boiler room on the roof of the building is underway. Also the internal finishing works of apartments and stairwells are being executed as well. The area in front of the building is covered with pavement. Along with these works, and depending on the weather conditions, the ramps leading to the underground garages are mounted. During the cold season, the inner walls of the second block will be built.

01.10.2012

01.08.2012

01.06.2012

Every day about 40 people paints the interior walls, executes flooring, are mouinting doors and kitchen furniture, waterproofing the roof, paints the facade etc. Also will begin the work on land improvment in June. It’s because the commissioning of the 4th building is soon. Assembling of the the 3rd block is finished. We are carrying out the interior works. Assembling the frame of the 2nd block is completed by 90%. Approximately 60 people are working daily in two shifts on mounting and finishing work of the both buildings.

01.04.2012

01.02.2012

01.12.2011

01.10.2011

01.08.2011

01.06.2011

01.04.2011

01.02.2011

Construction works on this job site was performed continuously during 2010-2011 winter season. Every day, 75 workers were doing various works on all three buildings. Thus, in January 2011, room divider walls were built on the first floor of 4th building. Also building of the fourth floor (level 6) starts. For the 3rd building, the first level of underground garages was made, and formworks for the second one starts. At 2nd building, assembling of reinforced underground walls began.

01.11.2010

01.09.2010

01.07.2010

01.05.2010

01.03.2010

Building of 1st house case has entered a final stage — mansard — in March, 2010. In the next months the facade and roof will be executed. Decoration work will begin. Building of 4th block will renew.

01.11.2009

Lay of foundation of 4th building and the skeleton of the 1st one.